1 Reply Latest reply on Aug 7, 2016 1:13 AM by Sandeep Jain

    can integration event be scheduled

    prakash lokhande Newbie

      As a schedule task performs a specific task at a given schedule,

      is it possible to schedule an integration event. If can be scheduled, in how many ways can it be scheduled.

        • Re: can integration event be scheduled
          Sandeep Jain Master

          Hello Prakash,

           

          Yes, integration events too can be scheduled same as Schedule Tasks. There is a "Schedules" parameter which you can specify in MessageConfiguration.table file to schedule an integration event to run on a specific interval.

           

          For ex. -

           

          Schedules = {

                                  Schedule1 = { DayOfWeek = Weekday; Hour = 20; Minute = 50; Second = 00;};

                              }

           

          Regards,

          Sandeep Jain